Sitemap
Pages
- Air Filtration in the Pharmaceutical Industry
- Air Quality Qualification in Isolators
- Annex 1 GMP 2023 – Impact of its Update for 2024
- Aseptic Isolator
- Aseptic Isolator for Filling Vials and Syringes
- Aseptic Isolator Supplier
- Aseptic Process to Protect Pharmaceutical Products from Contaminations
- Aseptic Transfer Isolators
- Automatic Aseptic Filling Line
- Biopharmaceutical Manufacturing – Introduction of the Biopharma Production Process
- Cell Culture Production in Cell Manufacturing
- Closed RABS (C-RABS) – EREA Pharma, Manufacturer of Closed RABS
- Company
- Contact
- Containment Solutions for the Pharmaceutical Industry
- CSR Commitments
- Custom-made Class A Isolators
- Custom-made Laboratory Fume Hood
- Customized Pharmaceutical Solutions
- Decontamination Solutions for Biotechnology
- Documentation
- download test
- EREA Pharma – Pharma solutions for a better life
- EREA Pharma – 製薬業界の新しいニーズに適応したソリューション
- Exhibition
- Freeze-drying: Advantages and Disadvantages
- Fully Automated Gloveless Aseptic Robotic Filling Line
- Glove Integrity – Leakage Tester for Gloveboxes and Isolators
- GMP class A isolators (ISO5)
- Handling of hazardous and toxic substances (OEB 5 to OEB 6)
- Innovation
- ISO 14644-7 – Clean rooms and controlled environments
- Isolator Decontamination Device
- Isolator for Filling Processes
- Isolator for sterile conditioning
- Isolator for the Pharmaceutical Industry
- Isolator with Electropolished Finish
- Isolator with H2O2 Biodecontamination
- Isolators for Aseptic-Toxic Processes
- Isolators With Freeze-Drying Equipment
- Legal Notices
- Maintenance for Pharmaceutical Isolator and Retrofitting
- Manufacturing Science and Technology (MSAT) in Biopharmaceutical Production
- News
- Open and Closed RABS by EREA Pharma – Safety First
- Open RABS – EREA Pharma, Manufacturer of Open RABS
- Partners
- Pharmaceutical Filling Machine Supplier
- Pharmaceutical Freeze Drying
- Pharmaceutical GMP – Complete Guide
- Pharmaceutical Isolator
- Pharmaceutical Isolator for the Production of Active Ingredients
- Pharmaceutical Isolator Qualification
- Pharmaceutical Isolator Supplier
- Pharmaceutical Product Filling Machines
- Pharmaceutical Production
- Process Analytical Technology (PAT) in Biopharmaceutical Manufacturing
- Production of Medical Treatments in a Sterile Environment
- Products
- Quality Compliance in the Pharmaceutical Industry
- Quality Control in a Sterile Environment
- Quality Control in Pharmaceutical Isolators
- Quotation
- RABS for Pharmaceutical Industry
- RABS for Sterile Application
- Radiopharmaceutical Dispensing Isolators
- Ressources
- Robotics in Aseptic Processing
- Services
- Sitemap
- Standard Aseptic Isolator
- Standard Sterility Test Isolator
- Sterile Isolator
- Sterile Product Manufacturing
- Sterility Control for Pharmaceutical Applications
- Sterility Test Isolator
- Sterility testing for pharmaceutical products
- Sterility Tests In Isolators
- Understanding Classification of Controlled Atmosphere Pharmaceutical Areas
Posts by category
- Category: Application
- HVAC – Revamping
- Assembly FFU flow
- Final updates – Isolator for sterile application
- INSTALLATION – L-UDAF
- METROLOGY AREA
- INSTALLATION – TOXIC ISOLATOR
- ASSEMBLY AT WORKSHOP – WEIGHING STATION
- FAT – ISOLATOR FOR TOXIC APPLICATION
- MOCK-UP RECEPTION
- Laminar vertical flow
- Sheet metal work – Isolator production
- Equipment – Pass-through SAS
- First pieces – Toxic isolator
- Visit from our Customer
- Bio Safety Cabinet
- Project in Progress – HVAC
- Focus – Welding Certification
- EREA Commitments
- Bio Safety Cabinets – Final Destination Reached
- Filling Tests
- Isolator Mock-up
- Minor Project – Protection Module
- SAS Installation
- Mock-up Validation by one of our Customers
- Departure of 2 Bio-safety Cabinets
- RABS Installation
- Mock-up Departure
- FAT OPEN RABS
- Advancing OPEN RABS
- One of our small isolators is ready for shipment!
- Validation of an isolator model in process in our workshop
- Validation of a RABS model in our EREA PHARMA workshop
- A new great achievement at EREA PHARMA
- A new great achievement in EREA PHARMA workshop
- In EREA PHARMA workshop, we continue the assembling of our last weighing station.
- End of sheet metal work for our new weighing station.
- Production of wooden models for mockup in progress at our EREA PHARMA workshop
- At EREA PHARMA, we have been designing and manufacturing isolators for over 20 years.
- Various stages of quality control are carried out at EREA PHARMA workshop.
- In EREA PHARMA workshop, we continue the assembly work on one of our isolators.
- Work continues on our new weighing station at EREA PHARMA workshop
- A new intervention by the EREA PHARMA teams on one of our toxic isolators.
- At EREA PHARMA, we are used to work with all our customers for after-sales service.
- We continue our work on our latest isolator at EREA PHARMA
- A new project is presently being developed for one of our customers at EREA PHARMA
- Another completed installation of a beautiful isolator at our customer’s workshop in Hungary.
- A new isolator is in process in our EREA PHARMA workshop.
- Installation by EREA PHARMA teams of a security hood in Switzerland.
- Replacement of old lighting at one of our customers’ plant.
- Follow up and end of our Bio decontamination and sterility tests
- We continue the assembly of our new safety hood in our workshop at EREA PHARMA
- We continue our assembly work in EREA PHARMA workshop
- A toxic isolator , for one of our European client, is being assembled in our EREA PHARMA workshop.
- Haute couture in our EREA PHARMA worshop
- Pictures of a 2008 Closed RABS in of one of our customers plant
- Another week ending on our Sterility Testing Isolator
- Finishing the FAT tests of our ATEX flow for on-site assembly
- Our FFUs successfully installed and qualified
- Last straight line for our sterility test isolator in EREA PHARMA workshop
- Category: Company
- EREA development : ISO.14.001 certification project
- Sustainable development week
- EREA staff training
- STAFF TRAINING
- ACHEMA 2024 – EREA EXHIBITION
- Exhibition- ACHEMA 2027
- FORUM – A3P Belgium 2024
- Save the date
- New year
- A3P Review
- A3P Congress
- Tailor-made hearing protection for EREA PHARMA teams
- Reminder of our Gloveboxes Group seminar
- A new glove box in our EREA PHARMA workshop
- Safety minute with our Occupational health and safety collaborators
- New equipment in process in our workshops
- FAT (Factory Acceptance Test) in progress today at our EREA PHARMA workshop
- At EREA PHARMA we are moving fast on our last weighing station.
- Newcomers at EREA PHARMA company
- EREA PHARMA is part of an expert department specialised in Clean Rooms
- There we are, our test sterility isolator has left the EREA PHARMA workshop.
- EREA PHARMA joins the community of La French Fab.
- Category: Event